Post new topic Reply to topic  [ 2 posts ] 

Board index : TeleFlow Forums : TeleFlow Designer & Simulator

Author Message
 Post subject:
PostPosted: Sun Dec 05, 2004 6:03 pm 
Offline

Joined: Sun Dec 05, 2004 5:37 pm
Posts: 10
We installed TF 2005 and ran the transfer demo test by using TEST.TAL. But when we ran TF Monitor, all 8 ports were red. We verified that the NMS board was booted successfully and if we ran answermachine.tal, everything went green on TF Monitor. Below is the error log produced. <br> <br>Dec 06 08:58:26.56: <br> Initialization done <br> <br>Dec 06 08:58:26.56: Shutting down <br>Dec 06 08:58:26.56: Destroying the CT Access context and queue <br>Dec 06 08:58:26.56: ctaWaitEvent failed: 4 <br>Dec 06 08:58:26.57: XMLList destructor done <br>Dec 06 08:58:29.57:


Back to top
 Profile  
 
 Post subject:
PostPosted: Mon Dec 13, 2004 10:35 am 
Offline

Joined: Wed Mar 19, 2003 4:28 pm
Posts: 510
Location: Canada
This doesn't look like a complete log. Although the end of the log may appear to be where the problem occurred, it could very well be something else. Please send a complete log of this problem to support@engenic.com, with a subject of "Devnet: Transfer Demo Fail to Start". We will respond in this thread.


Back to top
 Profile WWW 
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 2 posts ] 

Board index : TeleFlow Forums : TeleFlow Designer & Simulator


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Style by Midnight Phoenix & N.Design Studio
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group.